Tuesday 8th June
Buckby Top Lock to Gayton Junction
12 miles and 6 locks
Welcome to the English Summer, we both got totally drenched, maybe we should have left the locks until later, but hindsight is a wonderful thing.
When we had finished Buckby Locks we stopped for a cuppa and to dry out, after an hour or so we decided to carry on, as it had stopped raining, or so we thought. but apart from a heavy shower we arrived at Gayton Junction in the sunshine. We moored about 1/2 mile from Blisworth Tunnel for the night.
Short blog today no pictures, didn't want to get new camera wet.
Yet again no digital signal, I have my doubts about the Country going digital, will it work?
Wednesday, 9 June 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment